Subscribe here to be kept up to date with latest Projects and Offerings

FEATURED PROJECTS

Ben Ean Estate

earthconnect completed a 98.89kW Solar Energy System for Ben Ean Estate (formerly Lindeman’s), Pokolbin. The System will provide the Estate with approximately 146.0MWh of Renewable Energy pa, and a reduction of 155,658 pa of CO2 / Greenhouse Gas Emissions. The System comprises of; 319 x 310W JA JAM60 Solar Panels, 4 X SMA STP 25000TL […]

Project Update – 750kW Roof Mount

earthconnect has commenced the DC cable run on our latest project. All racking and tray has been installed, in time for the first delivery of modules and installation of reference panels. This project is progressing on time and on budget.      

Project Update – 1.3MW Roof Mount

earthconnect has completed installation on their 1.3MW Roof Mount System. The System comprises of;  SMA Sunny Tripower CORE1 50KW Inverters; and Approximately 5000 JAP6 JA Solar Panels We are now awaiting the Injection Test and Final Inspection which is scheduled for Mid-July.  

Rydges Sydney Central

earthconnect completed a 94.83kW Solar Energy System for Rydges Sydney Central, Surry Hills. The System will provide the Hotel with approximately 146.0MWh of Renewable Energy pa, and a reduction of 155,658kg pa of CO2 / Greenhouse Gas Emissions. The System comprises of; ·    327 x 290W JAM Percium JA Solar Panels, ·    4 X SMA […]

Mercure Sydney – Micro Inverter Installation

earthconnect completed a 96.39kW Solar Energy System for the Mercure, Sydney. The System will provide the Hotel with approximately 146.0MWh of Renewable Energy pa, and a reduction of 155,658kg pa of CO2 / Greenhouse Gas Emissions. The System comprises of; 357 x 270W JAP JA Solar Panels, 357 X Enphase Energy S230 Micro Inverters, Solar […]

Pattaya, Thailand – 8.0MW Project

earthconnect were engaged to complete all DC Cabling provisions for the Pattaya, Thailand 8.0mW Solar Farm.

Hunter Brewery

earthconnect completed a 99.9kW Solar Energy System for the Hunter Brewery, Pokolbin. The System will provide the Brewery with approximately 146.0MWh of Renewable Energy pa, and a reduction of 155,658kg pa of CO2 / Greenhouse Gas Emissions. The System comprises of; ·         370 x 270W JA JAM6 Solar Panels, ·         4 x  SMA  25000 Inverters, […]

Doyalson RSL

earthconnect completed a 99.84kw Solar Energy System for the Doyalson RSL, Doyalson. The system will provide the RSL with approximately 146.0mWh of Renewable Energy pa, and a reduction of 155,658kg pa of CO2 / Greenhouse Gas Emissions.

LATEST PROJECTS

Project Update – 750kW Roof Mount

earthconnect have all SMA Sunny Tripower CORE1 50KW inverters installed for the latest 750kW Roof Mount System. The Project is currently scheduled for commissioning at the end of October.  

Lambloch Estate

earthconnect completed a 24.3kW Solar Energy System for Lambloch Estate, Pokolbin. The System will provide the Estate with approximately 39.42MWh of Renewable Energy pa, and a reduction of 42,179 pa of CO2 / Greenhouse Gas Emissions. The System comprises of; 90 x 270W JA JAP6 Solar Panels, 1 x SMA STP20,000TL  Inverter, and Clenergy Racking. […]

Supporting our Local Community

earthconnect is proud to support West’s School Boy Rugby League, and in particular their Indigenous Round which recognises the Awabakal People as this regions traditional land owners,   earthconnect has also supported Warners Bay Junior Football Club this season, both of which is part of our commitment to give back to our local community.   […]

Hunter Valley Winery Ground Mount

earthconnect recently completed a 88.5kW Solar Energy System for a Winery in the Hunter Valley. The system will provide the winery with approximately 125.56MWh of Renewable Energy pa, and a reduction of 134,349kg pa of CO2 / Greenhouse Gas Emissions.   The System comprises of; 300 x 295W Trina Solar Panels, 4 x SMA STP20,000TL […]

SNEC PV Power Expo China 2018

earthconnect recently sent a contingent to Hong Kong and China, to meet with several of our current Supply Chain Partners, to review their Manufacturing / Research and Development Facilities, and to explore New Opportunities exhibited at the SNEC PV Power Expo. The contingent was taken through one of JA Solar’s Production and Development facilities, and […]

Manning Valley Racecourse

earthconnect completed a 49.68kW Solar Energy System for the Manning Valley Racecourse, Taree. This System will provide the Racecourse with approximately 73.0MWh of Renewable Energy pa, and a reduction of 77,985kg pa of CO2 / Greenhouse Gas Emissions. The System comprises of; 184 x 270W JA JAP6 Solar Panels, 2 x SMA Sunny Tripower 25000TL […]

Project Update – 750kW Roof Mount

earthconnect have commenced Construction on their next Project – 750kW Roof Mount System.   The site has been set up, whereby the safe work area has been demarcated, the scaffold has been erected and the ladder lift has been positioned and commissioned.   Walkways have been positioned and fixed, and the racking is being Installed. […]

Project Update – 1.3MW Roof Mount

  earthconnect have all SMA Sunny Tripower CORE1 50KW inverters installed for the latest 1.3MW Roof Mount System. The Project is currently on schedule, and progressing well.      

Project Update – 1.3MW Roof Mount

earthconnect have started to lay panels on their latest 1.3MW Roof Mount Project. Approximately 1500 of 5000 are down. The Project is currently on schedule, and progressing well.    

Project Update – 1.3MW Roof Mount

earthconnect have completed the DC cable run, and final terminations are being made today on their latest 1.3MW Roof Mount Project. With the first 400kW of Modules arriving onsite this afternoon, module placement will begin tomorrow.    The Project is currently on schedule, and progressing well.        

Hunter Valley Horse Stud

earthconnect completed a combined 150.0kW of Solar Energy across several Estate’s in the Hunter Valley. The project is split across multiple sites within the Estate to accommodate their Energy Usage. These System’s comprise of; JA Solar Panels, SMA Australia Inverters, and Clenergy Racking        

Project Update – 1.3MW Roof Mount

earthconnect have commenced Construction on their latest 1.3MW Roof Mount Project.   The site has been set up, whereby the safe work area has been demarcated, the scaffold has been erected and the ladder lift has been positioned and commissioned.   Walkways have been positioned and fixed, and the racking and cable tray is being […]

Project Update – 5.0MW Solar Farm

earthconnect are currently working through the Development Application and Statement of Environmental Effects with the Joint Regional Development Board and Local Council, and in the process of negotiating the final requirements associated with the Connection Offer through the local Grid Authority for a 5.0MW Solar Farm in the Hunter Valley. The park has proven both […]

Scone Aged Care Facility

earthconnect completed an 86.0kW Solar Energy System for the Aged Care Facility, Scone. The System will provide the facility with approximately 125.56MWh of Renewable Energy pa, and a reduction of 134,349kg pa of CO2 / Greenhouse Gas Emissions.   The System comprises of; ·         331 x 260W QCELL Solar Panels, ·         3 x ABB TRIO […]

Project Update – 1.3MW Roof Mount

earthconnect are currently in the process of conducting the Critical Design Review (CDR) and negotiating the Connection Offer through the local Grid Authority for a 1.3MW Roof Mount System.   The System will comprise 4,920 x Solar Modules, SMA 50,000 CORE 1 Inverters and Clenergy Racking.   The Network Protection Units (NPU) particulars shall be […]

Newcastle Strata Building

earthconnect completed a 25.2kW Solar Energy System for a Strata Building, Honeysuckle. The System will provide the complex with approximately 39.42MWh of Renewable Energy pa, and a reduction of 42,179 pa of CO2 / Greenhouse Gas Emissions. The System comprises of; 80 x 315W Jinko Solar Panels, 2 x Fronius Symo 12.5-3-M Inverters, and Clenergy […]

Scenic World

earthconnect completed a 99.47kW Solar Energy System for Scenic World, Katoomba. The System will provide Scenic World with approximately 146.0MWh of Renewable Energy pa, and a reduction of 155,658kg pa of CO2 / Greenhouse Gas Emissions. The System comprises of; ·    343 x 290W JAM Percium JA Solar Panels, ·    4 X SMA STP25,000TL Inverters, […]

Warragundi Estate

earthconnect completed a 29.0kW Solar Energy System for Warragundi Estate, Goolma. The Solar System will provide the Farm with approximately 43.61MWh of Renewable Energy pa, and a reduction of 46,866 pa of CO2 / Greenhouse Gas Emissions. The System comprises of; ·         100 x 290W JA JAM6 Percium Panels, ·         1 x SMA STP 25000TL […]

The Edwards

earthconnect completed a 29.97kW Solar Energy System for The Edwards, Newcastle. The Solar System will provide the Restaurant with approximately 43.61MWh of Renewable Energy pa, and a reduction of 46,866 pa of CO2 / Greenhouse Gas Emissions. The System comprises of; ·         111 x 270W JA JAP6 Panels, ·         1 x SMA STP 25000TL Inverter, […]

Child Care Centres – Great Option

earthconnect has recently installed several Solar Energy Systems for Child Care Centres across Newcastle. Solar is a great option for Child Care Centres, with their Trading Hours generally during Peak Solar Generation periods. With the rise in Energy Prices, these Child Care centres will have a less than 3yr pay back, with excellent results achieved […]

Salamander Bay Industrial Complex

earthconnect completed a 59.94kW Solar Energy System for an Industrial Complex, Salamander Bay. The System will provide the complex with approximately 92.0MWh of Renewable Energy pa, and a reduction of 93,638kg pa of CO2 / Greenhouse Gas Emissions.   The System comprises of; 222 x 270W JA JAP6 Solar Panels, 2 x  SMA  25000TL Inverters, […]

Warners Bay Industrial Complex

earthconnect completed a 99.36kW Solar Energy System for the Industrial Complex, Warners Bay. The System will provide the complex with approximately 146.0MWh of Renewable Energy pa, and a reduction of 155,658kg pa of CO2 / Greenhouse Gas Emissions. The System comprises of; 368 x 270W JA JAP6 Solar Panels, 4 x SMA  25000 Inverters, SMA […]

Manufacturing Company – Central Coast

earthconnect completed a 93.4kW Solar Energy System for the Manufacturing Company, Somersby. The System will provide the commercial complex with approximately 146.0MWh of Renewable Energy pa, and a reduction of 155,658kg pa of CO2 / Greenhouse Gas Emissions.   The System comprises of; 346 x 270W JA JAP6 Solar Panels, 3 x  Fronius 27000 Inverters, Fronius […]

Rutherford Industrial Complex

earthconnect completed a 99.36kW Solar Energy System for the Industrial Complex, Rutherford. The System will provide the complex with approximately 146.0MWh of Renewable Energy pa, and a reduction of 155,658kg pa of CO2 / Greenhouse Gas Emissions. The System comprises of; 368 x 270W JA JAP6 Solar Panels, 4 x  SMA  25000 Inverters, SMA Sunny […]

Lake Macquarie Workers Club

earthconnect completed a 50.0kW Solar Energy System for a Lake Macquarie Workers Club.   This Commercial Solar System will provide the Workers Club with approximately 73.0MWh of Renewable Energy pa, and a reduction of 77,985kg pa of CO2 / Greenhouse Gas Emissions.   The System comprises of;   200 x 250W JA JAP6 Solar Panels, […]

Lake Macquarie Leagues Club

earthconnect completed a 99.84kw Solar Energy System for a Lake Macquarie Leagues Club. The Commercial Solar System will provide the Club with approximately 146.0mWh of Renewable Energy pa, and a reduction of 155,658kg pa of CO2 / Greenhouse Gas Emissions.

Battery Storage System

earthconnect completed a 6.24kWp Three (3) Phase Hybrid Battery Storage System for a client recently, the System comprised of 9.6kWh of Usable Storage, the Batteries have a maximum nominal discharge power of 6400 W.

Sydney Supermarket

earthconnect completed a 98.53kw Solar Energy System for a Sydney Supermarket, St Marys. The System will provide the Supermarket with approximately 146.0mWh of Renewable Energy pa, and a reduction of 155,658 pa of CO2 / Greenhouse Gas Emissions.

Stand Alone Power Systems (SPS) Off Grid Solar

earthconnect have delivered several Stand Alone Power Systems (SPS) around NSW. There are several options available, however earthconnect generally incorporates SMA Inverters and Sunny Island Technologies.

Solar Thermal Project – Sydney CBD

earthconnect were engaged to complete the installation of a Solar Thermal Project in the heart of Sydney’s CBD.

Central Coast Supermarket

earthconnect completed a 99.75kw Solar Energy System for a Central Coast Supermarket, Budgewoi. The System will provide the Supermarket with approximately 146.0mWh of Renewable Energy pa, and a reduction of 155,658 pa of CO2 / Greenhouse Gas Emissions.

Cobar Bowling & Golf Club

earthconnect completed a 50.0kw Solar Energy System for the Cobar Bowling and Golf Club, Cobar. The System will provide the Golf Club with approximately 73.0mWh of Renewable Energy pa, and a reduction of 78,000 pa of CO2 / Greenhouse Gas Emissions.

Cobar RSL

earthconnect completed a 49.92kw Solar Energy System for the Cobar RSL, Cobar. This System will provide the RSL with approximately 73.0mWh of Renewable Energy pa, and a reduction of 77,985kg pa of CO2 / Greenhouse Gas Emissions.

Foghorn Brewhouse Newcastle

earthconnect completed a 68.05kw Solar Energy System for the Foghorn Brewhouse, Newcastle. The System will provide the Brewhouse with approximately 99.28mWh of Renewable Energy pa, and a reduction of 106,308 pa of CO2 / Greenhouse Gas Emissions.

Foghorn Brewhouse Erina

earthconnect completed a 29.87kw Solar Energy System for the Foghorn Brewhouse, Erina. The System will provide the Brewhouse with approximately 43.61mWh of Renewable Energy pa, and a reduction of 46,866 pa of CO2 / Greenhouse Gas Emissions.

Hunter Christian School

earthconnect completed a 91.2kw Solar Energy System for the Hunter Christian School, Mayfield. The System will provide the School with approximately 131.4mWh of Renewable Energy pa, and a reduction of 144,972kg pa of CO2 / Greenhouse Gas Emissions.

Hunter Valley Chicken Farm

earthconnect completed a 29.64kw Solar Energy System for the Hunter Valley Chicken Farm, Tomago. The System will provide the Chicken Farm with approximately 43.8mWh of Renewable Energy pa, and a reduction of 46,304 pa of CO2 / Greenhouse Gas Emissions.

Newcastle Strata Building

earthconnect completed a 27.0kw Solar Energy System for a Newcastle Strata Building, Honeysuckle. The System will provide the complex with approximately 39.42mWh of Renewable Energy pa, and a reduction of 42,179 pa of CO2 / Greenhouse Gas Emissions.

Olivieri Flowers

earthconnect completed a 99.64kw Solar Energy System for Olivieri Flowers, Doyalson. The System will provide the Flower Farm with approximately 146.0mWh of Renewable Energy pa, and a reduction of 155,970kg pa of CO2 / Greenhouse Gas Emissions.

Industrial Site Brisbane

earthconnect completed a 100.0kw Solar Energy System for an Industrial Site, Narangba QLD. The System will provide the Industrial Site with approximately 146.0mWh of Renewable Energy pa, and a reduction of 155,658kg pa of CO2 / Greenhouse Gas Emissions.

Crowne Plaza Hunter Valley

earthconnect completed a 99.58kw Solar Energy System for the Crowne Plaza Hunter Valley, Lovedale. The System will provide the Resort with approximately 146.0mWh of Renewable Energy pa, and a reduction of 155,564kg pa of CO2 / Greenhouse Gas Emissions.

Fairmont Resort

earthconnect completed a 99.84kw Solar Energy System for the Fairmont Resort, Leura. The System will provide the Resort with approximately 146.0mWh of Renewable Energy pa, and a reduction of 155,658kg pa of CO2 / Greenhouse Gas Emissions.

Winery Ground Mount

earthconnect completed a 20.0kw Solar Energy System for the Martindale Winery. The System will run their Dam Pumps, and provide the Winery with approximately 29.2mWh of Renewable Energy pa, and a reduction of 31,244kg pa of CO2 / Greenhouse Gas Emissions.

Warnvervale Medical Complex

earthconnect completed a 54.08kw Solar Energy System for the Warnvervale Medical Complex, Toukley. The System will provide the complex with approximately 80.3mWh of Renewable Energy pa, and a reduction of 84,484kg pa of CO2 / Greenhouse Gas Emissions.